公司新闻
- 地坪漆施工在性价比上矛盾难以调和
- 冬季低温加快环氧地坪漆原材料干燥的方法
- 如何减少环氧地坪漆施工产生的废气
- 什么因素严重影响环氧地坪漆的表面视觉效果
- 环氧地坪施工对混凝土基面有什么要求么?
- 解析环氧地坪漆的施工技巧有哪些?
- 如何使用才能增加地坪漆的使用寿命?
- 如何解决环氧地坪漆地面不平问题
- 素地处理关系着后期环氧地坪系统的质量
- 环氧地坪起皮的原因及处理方法
行业动态
158-6158-3366
手机:158-6158-3366
传真:0510-66887687
QQ:1101946648
地址:无锡市新区泰伯大道208号
素地处理关系着后期环氧地坪系统的质量
文章出处:本站 发布时间:2020-03-04 16:16:38 浏览:510
环氧地坪在道路建设中运用越来越广,但是我们也发现了一些问题,有些环氧地坪在施工一段时间后就可能出现质量问题,严重影响了整个环氧地坪的使用年限。这是什么原因呢?根据我们的研究发现排除环氧地坪涂料质量问题,极有可能是基层素地处理不到位导致的,因为基层素地处理对于整个环氧地坪施工是十分重要的。现在无论是业主,还是有些不正规的地坪施工队伍,都对于素地处理成本相当忽视。有的业主在选择地坪公司的时候仅考虑价格,但是没有把自身地面处理的预算考虑进去。有的地坪公司在报价的时候为了降低报价,会忽略素地处理,在施工时也会忽略这一工序。
Epoxy flooring is used more and more widely in road construction, but we also find some problems. Some epoxy flooring may have quality problems after a period of construction, which seriously affects the service life of the whole flooring. What is the reason for this? According to our research, it is very likely that the quality problems of floor coatings can be excluded due to the inadequate treatment of the basic plain ground, because the basic plain ground treatment is very important for the construction of the whole epoxy floor. Nowadays, both owners and some irregular construction teams have neglected the cost of plain land treatment. Some owners only consider the price when choosing the flooring company, but they do not take the budget of their own ground treatment into account. In order to reduce the quotation, some flooring companies will neglect the treatment of vegetable land and this process will also be neglected in the construction. 其实不然,如果素地强度不高、不平整,油污较多等,都会极大的影响整个地坪的质量,影响地坪的附着力,进而影响地坪的使用寿命。所以素地处理成本无论如何是不能被忽视的。
In fact, otherwise, if the intensity of plain land is not high, uneven, and there is more oil pollution, it will greatly affect the quality of the whole floor, affect the adhesion of the floor, and then affect the service life of the floor. Therefore, the cost of plain treatment can not be ignored in any case.
另外我们在做混凝土时一定要严格要求混凝土质量,在后期做地坪时也不能贪便宜做不适合的地坪,否则在使用中会极大的损坏原来的混凝土地面,使得后期返修或者重做地坪时,反而需要花费更多的金钱去进行地面处理,得不偿失。
In addition, when we make concrete, we must strictly require the quality of concrete. When we make the floor in the later stage, we should not be greedy and inexpensive to make the unsuitable floor. Otherwise, the original concrete floor will be greatly damaged in use, so that when we repair or redo the floor in the later stage, we need to spend more money on the ground treatment, which is not worth the loss.
评论
-
管理员刚刚
暂无任何留言!